1300 East Reconstruction; 7800 South to 11000 South

  • Location: Sandy City, Utah
  • Owner: Sandy City
  • Project Manager: Ryan Kump, Sandy City Engineer
  • Design: 2006-2007
  • Construction: 2008-2010
  • AADT Before Construction: 31,120 (2008)
  • AADT After Construction: 29,960 (2015)

St. George Boulevard Reconstruction; Bluff Street to I-15

  • Location: St. George, Utah
  • Owner: Utah Department of Transportation (UDOT)
  • Project Manager: Tamerha Maxwell, UDOT
  • Design: 2003-2004
  • Construction: 2005-2006
  • AADT Before Construction: 19,230 (west end) to 33,960 (east end) (2004)
  • AADT After Construction: 18,275 (west end) to 42,020 (east end) (2015)

State Street Widening; 10600 South to 11400 South

  • Location: Sandy City, Utah
  • Owner: Utah Department of Transportation (UDOT)
  • Project Manager: Oanh Le-Spradlin, UDOT
  • Design: 2016
  • Construction: 2018
  • AADT Before Construction: 33,000 (2016)
  • AADT After Construction: Scheduled completion 2018