Communications

UDOT crews use ultrasonic testing methods on Salt Lake County bridge

Posted on: February 10th, 2025

Crews inspect more than 150 Utah bridges per month Utah Department of Transportation (UDOT) crews inspected one of Salt Lake’s “Spaghetti Bowl” bridges with ultrasonic testing yesterday.  This technology uses a transducer to transmit high frequency sound waves into difficult-to-see parts of a bridge, searching for damage, deterioration or any other factors that may raise […]

Lack of valley snow allows UDOT crews to get more maintenance work done

Posted on: February 5th, 2025

Crews filled 78 potholes in one night, while other crews clear drains, repair highway signs and complete other work Despite little snow in valleys, Utah Department of Transportation (UDOT) maintenance crews are keeping busy this winter.  Crews are still out regularly pre-treating the roads to prevent ice, and plowing in the canyons where there is […]

UDOT celebrates one year of West Davis Highway, completes study for next expansion

Posted on: January 30th, 2025

One year after officially opening, the West Davis Highway (SR-177) is improving travel on I-15 in Davis County and on local roads for drivers. Utah Department of Transportation (UDOT) engineers have observed about 28,000 vehicles per day use the new 16-mile, four-lane divided highway. “That’s 28,000 vehicles that are also not on I-15,” UDOT Project […]

UDOT receives $9.6 million federal grant for wildlife safety

Posted on: January 15th, 2025

Funds will restore vital corridors and habitats, reduce collisions  The Utah Department of Transportation (UDOT) has been awarded a $9.6 million federal grant to make wildlife safety improvements along US-40 in Wasatch and Duchesne counties. The project will add 23 miles of wildlife fencing along US-40, retrofit three existing wildlife underpasses and add one new […]

UDOT launches communications program for Wasatch Back

Posted on: January 13th, 2025

Travel updates begin on Jan. 22  The Utah Department of Transportation (UDOT) is bringing increased communication to drivers traveling in Parleys Canyon and the Park City area. UDOT Wasatch Back will provide real-time updates and driver education on social media (@udotwasatchback on Instagram, Facebook, and X) and a website, wasatchback.udot.utah.gov. This is an extension of the Roads to Recreation […]

UDOT announces end-of-year construction totals and milestones

Posted on: January 9th, 2025

Crews have built new highways, trails and interchanges The Utah Department of Transportation (UDOT) completed 138 projects statewide during 2024, with a total value of approximately $1 billion.  In 2024, UDOT undertook major improvements to Utah’s transportation network, including bridge repairs, new highways and interchanges, enhanced safety features, and expanded multi-use trails that connect existing […]

UDOT and DPS release preliminary 2024 statewide traffic fatality numbers

Posted on: January 7th, 2025

The Utah Department of Transportation (UDOT) and Department of Public Safety (DPS) today released preliminary traffic fatality data for the 2024 calendar year.  Preliminary reports show there were 281 lives lost on Utah roads from Jan. 1, 2024 through Dec. 31, 2024. There were 279 fatalities on Utah roads in 2023. “By reviewing these numbers […]

South Jordan man in wheelchair is first to use UDOT’s new pedestrian bridge

Posted on: December 24th, 2024

New bridge over Bangerter Highway near 9800 South now open to the public Jacob Chesley received an unexpected early Christmas gift when the new pedestrian bridge over Bangerter Highway in South Jordan opened Saturday, which is a common path he and his uncle, Kurt, use when they go for walks. The 38-year-old, who lives with […]

UDOT to close 9800 South at Bangerter Highway in South Jordan

Posted on: December 20th, 2024

Crews will halt east-west travel to convert intersection into interchange The Utah Department of Transportation (UDOT) will close east and westbound travel at 9800 South and Bangerter Highway in South Jordan this weekend. Lane shifts and closures will begin at 10 p.m. Friday, Dec. 20, and last for 10 months as crews update the intersection […]

UDOT secures $39.6 million from federal congestion relief program

Posted on: December 4th, 2024

Funds will use adaptive ramp meters to reduce travel times on I-15  The Utah Department of Transportation (UDOT) has secured a $39.6 million federal Congestion Relief Grant to install coordinated adaptive ramp meters (CARM) along southbound I-15 from South Salt Lake to Bluffdale.    UDOT will be one of the first in the nation to use […]