A new cross walk with multiple signal phases is now in operation in North Salt Lake.
Managing Nicely
Incident Management Teams help keep traffic flowing along the Wasatch Front.
Cable Barrier
When installed properly between opposing traffic lanes, cable barrier prevents crossover collisions.
Ped Scramble
UDOT traffic engineers take special care to accommodate vehicle and pedestrian traffic generated by special events.
DDI and Apple Pie
UDOT’s new Diverging Diamond Interchange is sweet when it comes to mobility and safety.
ENGINEERING SPECIALTIES AT UDOT
Materials engineer John Butterfield discusses concrete pavement with workers on the I-15 Corridor Expansion Project.
UDOT Engineers from many different areas of expertise work together at improve our transportation system.
Don’t Zone Out
UDOT transportation project work zones are set up to be as safe as possible – do your part as a motorist, cyclist or pedestrian by traveling with care.
Detecting a Disturbance in the Force
Traffic signal detection devices operate in various ways — all help traffic move more efficiently.
Forecasting for Smarties
Area specific, accurate and timely weather forecasts make UDOT more efficient.
Sign Elevated
New “Welcome to Utah” highway signs that feature images of attractions.